Schedule Dates
The dates block names the dates a scheduled run loads, once, derived from its schedule slot. Every run of a slot gets the same dates: the scheduler's run, a run started for the slot with --scheduled-at, a retry, and a backfill run.
schedule: "CRON_TZ=Asia/Tokyo 0 2 * * *"
calendar: jp-banking
dates:
target_day: -1d
target_compact: { from: target_day, format: date_compact }
month_start: [-1d, month_start]
last_open_day: -1bd
window_start: { from: interval_start, format: rfc3339 }
window_days: { each: 1d }
loaded_at: { format: "%Y/%m/%d %H:%M", timezone: UTC }
steps:
- id: load
run: ./load.sh --date ${dates.target_day} --since ${dates.window_start}For the run fired at 2026-11-10 02:00 in Tokyo, target_day is 2026-11-09, target_compact is 20261109, month_start is 2026-11-01, and window_days is ["2026-11-09"].
Entries
An entry is a shift written as a string or a list, or an object:
| Field | Meaning | Default |
|---|---|---|
from | scheduled_at, interval_start, interval_end, next_scheduled_at, or another entry | scheduled_at |
each | A step through the window, such as 1d. The entry becomes a list. | none |
shift | One operation, or a list applied left to right | none |
format | A named format or a strftime pattern | date |
timezone | The zone used for shifting and formatting | see below |
target_day: -1d means { shift: -1d }. An entry that starts from another entry starts from its instant after its shift, takes its zone unless it sets one, and does not take its format.
Shifts
| Operation | Meaning |
|---|---|
+N or -N with min or h | Elapsed minutes or hours |
+N or -N with d, w, mo, y | Calendar days, weeks, months, or years in the zone |
+N or -N with bd | Business days of the slot's calendar |
hour_start, day_start, week_start, month_start, year_start | The start of that unit; weeks start on Monday |
bd_or_next, bd_or_prev | The same day when it is a business day, else the next or previous one |
- A day shift keeps the wall-clock time across a daylight saving change, and a month shift clamps to the last day of a shorter month: March 31 minus one month is the last day of February.
mis rejected, so a month never silently becomes a minute: writeminormo.[month_start, +1mo, -1d, bd_or_prev]is the last business day of the month.
Formats
date (2026-11-09), date_compact (20261109), datetime (2026-11-09 02:00:00), rfc3339 (2026-11-09T02:00:00+09:00), unix (1794157200), or a strftime pattern such as %Y/%m/%d. An unknown directive fails dagu validate.
Lists
{ each: 1d } lists the window from interval_start up to, but not including, the slot, as a JSON array. Monday's run of a weekday schedule owns the window from Friday, so its window_days is Friday, Saturday, and Sunday. Load one day per child with parallel:
steps:
- id: per_day
action: dag.run
with:
dag: load_day
params:
DAY: ${ITEM}
parallel: ${dates.window_days}1bdlists the business days. A step under one day, such as1h, needs aformat.- A list holds at most 1,000 values, the
parallellimit.
Time Zones
An entry is shifted and formatted in its timezone, else the zone of the entry it builds on, else the zone of the slot's schedule (context.run.timezone), else the server's tz.
Business Days
bd, bd_or_next, and bd_or_prev use the calendar of the schedule entry that fires the slot, its own or the DAG's. A sub-DAG uses the DAG's calendar. dagu validate fails when a recurring start schedule has no calendar.
Where Dates Resolve
- A run resolves its dates once, when it is created, and records them. A retry reads the recorded dates, even after the DAG or its calendar changed.
${dates.NAME}resolves wherever${params.NAME}does, includingenv, except in the fields that resolve while the DAG loads:consts,params[].eval, and the map form ofworker_selector. Pass a date to a script throughenv.- A sub-DAG resolves its own
datesfrom its parent's slot. - A run started without a slot, by hand, from a webhook, from a watched folder, or as a sub-DAG of a parent with none, gets the default slot: the latest fire at or before it was created. A monthly load started on the 15th loads what its run of the 1st loaded. The run counts as that slot's run and records that the slot was the default.
- On a DAG without a recurring schedule,
scheduled_atis the minute the run was created, and a date that needs a window, frominterval_startornext_scheduled_at, or a list, is refused before the run is created.dagu validatewarns about such a date. dagu validatereports a${dates.NAME}the DAG does not declare.